From paper timesheets to digital time tracking: how to make the switch before the season
Collecting timesheets, checking them, typing them up: that costs office hours every month. The switch to digital time tracking works best in the weeks before the season. This guide offers a checklist for choosing the software and a timeline up to the first day of harvest.
The starting point: the journey of a paper timesheet
The worker fills in the sheet, the foreman collects it, the office checks it, types it up and reports the hours to payroll. Many farms work this way: in a survey by top agrar (September 2026), 67% of 552 respondents record hours mainly on handwritten timesheets, 15% with an app or software, and 9% each with Excel or with a time clock, chip card or terminal.
What a switch can achieve is described in top agrar by a family farm with dairy cattle, a cheese dairy and around 15 employees: checking the sheets, transferring them to Excel and reporting the hours used to take four to five hours every month; with the app it now takes half an hour. That is one farm’s experience, not a promise for yours.
Checklist for choosing the software
| Question | What to look for |
|---|---|
| Workers’ languages | Time tracking in Polish or Romanian is only useful if the worker’s screen is translated. Ask to see that screen, not the office’s. |
| Own phone or terminal | If workers clock in by QR code on their own phone, you need no devices in the field. Does an app have to be installed or an account created? A terminal helps if not everyone has a phone. |
| Internet in the field | Does the software need a connection when clocking in? Check the reception where people clock in: at the yard, at the edge of the field, in the polytunnel. |
| Breaks | Does the worker clock the break, or does the software deduct it? Can the office find missing breaks and add them? |
| Confirmation by the worker | Can the worker see their hours and confirm or dispute them? If your NAV requires a signature, clarify how you will collect it. |
| Export for payroll | Which formats are available (Excel, CSV, PDF)? Is there an interface to your payroll software? Show your accountant a sample file. |
| Data protection | Where is the data stored, who has access, what happens when the contract ends? Is the workers’ location recorded? Ask for the answers in writing. |
| Costs | If billing is per head, ask how workers employed for a short time are counted. A price based on farm size stays the same throughout the season. |
Timeline: six weeks to the first day
- 1 Six weeks before: decide
Choose the software and decide who is responsible in the office. Agree with payroll in what form they want the hours.
- 2 Four weeks before: master data
Enter employees, groups, work steps and hourly wages. Returning workers are then already on the list; new workers are added as they arrive.
- 3 Two weeks before: print badges
Print a badge for each worker and keep spares ready. Put up short instructions in the workers’ languages.
- 4 One week before: trial run with the foremen
The foremen clock in themselves for two days: in, break, change work step, out. The office checks the entries and the export. Whatever snags here would otherwise snag on the first day of harvest.
- 5 First day: allow time
Allow a quarter of an hour on the first morning. A foreman demonstrates the steps once and stays there while people clock in.
- 6 First week: check daily
Look at open entries and missing breaks every evening. What you settle on the same day stays small.
Common stumbling blocks
- Starting too late: if you switch in the first week of harvest, you learn under time pressure. The trial run belongs before the season.
- No reception where people clock in: test at the spot where they clock in, and with phones on several networks.
- Forgetting to clock out: it happens. Decide who closes open entries in the evening.
- Paper and app side by side: recording twice means checking twice. Set a cut-over date.
- Workers not informed: before the first day, explain why you are switching and what happens to the data. The farm in the field report handed out an information sheet and stated in it that the aim was not to monitor anyone.
Sources
- top agrar: Arbeitszeiterfassung – Zwei Drittel der Landwirte sehen Pflicht kritisch (survey on recording working time), 12 September 2026 (external website)
- top agrar: Adieu Zettelwirtschaft – Digitale Zeiterfassung im landwirtschaftlichen Betrieb (field report from a farm), 24 September 2026 (external website)
- Federal Ministry of Labour and Social Affairs (BMAS): questions and answers on recording working time, 8 August 2025 (external website)
- Federal Ministry of Labour and Social Affairs (BMAS): documentation duty under the minimum wage, with sample form, 1 January 2026 (external website)
- Chamber of Skilled Crafts for Lower Bavaria and Upper Palatinate (Handwerkskammer Niederbayern-Oberpfalz): new ministerial draft bill amending the Working Time Act (external website)